Eaton IZMX-AS22-40-1 Power Def...
IN STOCK (leaves warehouse same day if ordered before 3pm ET)
$791.36
$741.36

Eaton IZMX-AS22-40-1 Power Defense ICCB auxiliary switch, PXR Auxiliary Switch, Long Leads Kit, Power Defense ICCB, RF Frame, PXR

(No reviews yet) Write a Review

Model: IZMX-AS22-40-1

In Stock (leaves warehouse same day if ordered before 3pm ET)

$791.36
$741.36
Adding to cart… The item has been added
Free Shipping on orders over $99
We price match and offer bulk discounts! Click Add to Quote. It's quick and easy.
Earn points with this purchase! You can redeem points for giftcards, iPads, XBox's and more. View Rewards
Free Keying on all locks
Eaton Power Defense ICCB auxiliary switch, PXR Auxiliary Switch, Long Leads Kit, Power Defense ICCB, RF Frame, PXR

Manufacturer Resources

Product Specs

Accessories:
Auxiliary switch
Certifications:
UL Listed
Frame:
RF
Product Height:
2 in
Product Length Depth:
8 in
Product Weight:
1.5 lb
Product Width:
2 in
Series:
Series NRX
Special Features:
Long Leads Kit
Trip Type:
PXR
Product Group:
Electrical
Department:
Electrical
Product Details:
PXR Auxiliary Switch

Eaton IZMX-AS22-40-1 – Frequently Asked Questions

How fast can I get the Eaton IZMX-AS22-40-1 delivered?
Most orders ship the same day from our distribution partners, with quick delivery throughout the continental U.S. Need it urgently? Contact Us for expedited shipping options.
Can I return it if it doesn’t work for me?
Yes—ZenSupply offers a hassle-free return policy. If the product isn’t the right fit, reach out to our support team for a return authorization or setup a return by following our return instructions.
Does the Eaton IZMX-AS22-40-1 come with a warranty?
Absolutely. The Eaton IZMX-AS22-40-1 is backed by a manufacturer’s warranty. For full warranty terms, check the product documentation or Contact Us.
How do I get technical support or installation help for the Eaton IZMX-AS22-40-1?
You can call, text, or email our expert support team for fast answers. We’re here to help with product selection, installation tips, and troubleshooting. Contact Us
Why buy the Eaton IZMX-AS22-40-1 from ZenSupply?
ZenSupply makes it easy to get the commercial door hardware you need—fast shipping, expert support, and rewards on every order. Our team is always ready to help you choose the right product for your project.